From: route@monster.com
Sent: Thursday, April 07, 2016 11:55 AM
To: hg@apeironinc.com
Subject: Please review this candidate for: p6 Scheduler
This resume has been forwarded to
you at the request of Monster User xapeix03
|
|||||||
|
|||||||
|
|
|
||||||
|
||||||
|
Jonathan D. Wolff Jwolff1009@gmail.com 608-445-6878 381 Sun Ct Sun Prairie, WI 53590 Objective: To
obtain a full-time position as a planner and to advance my career and gain an
in-depth understanding of while utilizing my work ethic and analytical
skills. Qualifications:Strong
problem solving and analytical skills within supply chain, production, and
inventory Driven individual willing to work Understand continuous improvement practices and
root cause analysis Proficient in MS Office Suite, Epicor, Sage Timberline, Primavera P6 Experience in AutoCAD, Arc Map, Microsoft Project Flexible with
willingness to adapt and learn quickly Certifications:APICS Basics of Supply Chain Management; CPIM
Module 1 of 5 complete Education:University of Wisconsin-Stout, Menomonie, WI (2005-2010) B.S. Degree in Business Administration B.S. Degree in Supply Chain Management Final GPA: 3.25/4.0 Related
Courses:- Principles of
Logistics- Accounting Fundamentals - Lean Enterprise- Material
Management and Resource Planning - Supply Chain System Design-
Purchasing and Supply Chain Management Professional Experience: Sussek Machine Company. Waterloo, WI – Production
Scheduler– April 2013 – Current -
Scheduled over 200 parts on
50 work areas -
Planned labor assignments
for all 3 shifts daily -
Managed shop load 6 months
out -
Managed part transitions -
Conducted yearend inventory
and miscellaneous inventory checks -
Maintained long term load
report along with analysis for capacity planning -
Liaison for maintenance,
engineering, purchasing, accounting, customer service, and sales DeForest Area
School District DeForest, WI – Assistant Track and Field Coach– May 2015 – Current -
Throwing Events Coach -
Volunteer for 2013 and 2014
seasons PDM Bridge,
LLC. Eau Claire, WI – Plant Scheduler/Accountant–
April 2012 – March 2013 -
Developed production
schedules for projects to determine labor constraints, negative cost impacts,
and timelines for completion -
Managed material and drawing
need by dates in coordination to shop capacity needs -
Created work plan for each
area of plant to determine proper sequence and priority for work in backlog -
Provide Plant Staff
with appropriate direct labor heads needed by month based on work mix -
Analyzed shop performance by
job, bridge type, work area, quality, and schedule -
Cross Functional team work
between the Shop Floor, Plant Staff, and Project Management -
Plant burden budget tracking
and reporting -
PDM Bridge,
LLC. Eau Claire, WI – Production Auditor–
January 2011 – March 2012 -
Manage Corporate performance
information system -
Break down estimates into
work detail plans used to manage employee allocation, and to track
performance to estimate -
Work with Company Financial
Statements to apply for qualification to make direct bids with targeted
States Departments of Transportation -
Manage corporate performance
system tracking and reporting PDM Bridge,
LLC. Eau Claire, WI – Supply
Chain Modernization Intern – March 2010 – January 2011 -
Detailed cost and labor
estimating utilizing MS Excel spreadsheets for manufacturing processes -
Showed potential benefits from upgraded equipment
and part routings of future jobs -
Conducted time studies to develop labor standards
and best practices for use in estimating UW-Stout, Menomonie, WI – Track and Field Assistant Coach
– November 2011- Current -
Organize and supervise practice for 8-12 athletes -
Analyze and coach athletes technique to maximize
athletic performance -
Recruit prospective athletes Achievements: Sussek Machine
Company -
Improved fill rate one day
out from 80% up to 99% -
Shop efficiency increased
from 85% to consistently 90-100% -
Improved company’s on time
delivery to 100% with largest customer -
Successfully planned around shop improvements -
Developed kanban area to reduce movement and
improve tracking ability of most common parts PDM Bridge,
LLC. -
Forecasted over $15 million
in billing -
Planned and scheduled over
25 bridge projects -
Designed corporate performance spreadsheet with
utilization of pivot tables that allowed for my dynamic use of data from
accounting software -
Provided analysis used in
the justification of a plant acquisition UW-Stout -
Coached 6 athletes to NCAA
Division 3 All Americans -
Coached 4 WIAC Conference
Champions -
4 year letter winner in the
throwing events -
Elected as Senator and
Caucus Leader for Stout Student Senate |
|
|
||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|